Engineering Department

Contact

Steve Willie
City Engineer

1700 Cooper Point Rd SW #B-2
Olympia, WA 98502-1110

Engineering Department

The City of Ruston's Engineering department reviews and approves all civil engineering aspects of development applications and street excavation permits.  Generally, the engineering review timeline is about 2 weeks on most submittals. Check out more information under Sewer and Storm water for resources for additional information and application forms.

Street Excavation Permits:

The City of Ruston requires ALL work in the Right-of-Way and within 15' of the right of way to submit plans and application materials for a Street Excavation Permit. This includes but is not limited to the following:

  • Residential Sewer/water/gas line repair
  • Electrical Utility-permanent/temporary power
  • Utility Trenching
  • CCTV Pipeline inspections

SEP Applications

Public ROW Use Streets & ROW

Posted on October 22, 2018

Street Excavation Permit Streets & ROW

Posted on October 22, 2018